Busia Junction, Odorkor - Accra
Monday - Friday 08:30am-5:00pm
+233 (0) 245 199 271

Toilet Digester Installation at Nsawam

OtechbioTech > Toilet Digester > Toilet Digester Installation at Nsawam

Project Details

Client:Pure Water Production Company
Location:Nsawam
Value:$1600
Year Completed:2019
Category: Toilet Digester

Project Overview

Toilet digester installation at Nsawam for a pure water manufacturing company. This system is been used by over 60 people. With pipping connected into the ground . An elongated French drain soak away system which allows treated effluent to leach into the soil . when ever fecal matter is flushed from the WC , beneficial bacteria In the digester system break down fecal matter and convert fecal matter into carbon dioxide and clean water. Co2 escapes through vents and treatment effluent moves through pipping into gutters,the environment or soak away to be leached into the soil. Project estimated at $ 1,600.00